Construction Change Order
The signed agreement to change the work during a project: what is added, removed or changed and why, each cost with the credits, the change in contract time, and the contract sum before and after, worked out to the cent.
ReportDraft Construction from $12 a month. 14-day free trial with your first report and up to 5 template downloads. Card required, nothing charged today, cancel anytime. Need just one? One change order for $19, no subscription.
Sample notes, 139 words
Project: Maple Ridge Townhomes, Unit B renovation Change order number: 7 Address: 412 Mill Street Project number: 2026-118 Owner: Dana Whitfield ...
We found 6 cost items totaling $2,491.50: new contract sum $193,241.50.
Filled in for you
14 days free, nothing to pay today. After your first report, your name, license and company details fill in by themselves. Or preview your own notes first, no sign-up.
What goes in it
Every change order from ReportDraft follows the same professional structure, so clients and reviewers find things where they expect them.
- Reason for the changeOne to three sentences from the notes on why the change is needed: who asked for it, what was found or decided, and any reference the notes give (an RFI, a drawing revision, a site instruction, an inspector's direction). Never invent a reference or a reason.
- Description of the changeThe work added, removed or changed, by location and trade, with the quantities, sizes, materials and specifications the notes give, in plain contract language ("Supply and install ...", "Delete ..."). Say what is excluded if the notes say so. Never state amounts: the cost breakdown and the contract sum table show them.
- Cost breakdownItem, Labor, material, equipment or other, Quantity, Amount
- Schedule impactOne or two sentences from the notes on the change in contract time and why, and the new completion date if given. If the notes say the time does not change, say so. If the notes say nothing about time, write "No change to the contract time is requested."
How it works
1. Add your notes. Type or paste what you saw. Rate items with one tap if you like.
2. Get a draft. Findings, recommendations and a summary are written for you, in your report's structure.
3. Check, sign, send. A completeness list shows anything missing. Sign to lock the PDF and download Word too.
Why it pays for itself
Template preview
Questions
What goes in a change order?
The signed agreement to change the work during a project: what is added, removed or changed and why, each cost with the credits, the change in contract time, and the contract sum before and after, worked out to the cent. ReportDraft lays it out in 4 sections: reason for the change, description of the change, cost breakdown, schedule impact.
Do my state's rules change the report?
Pick your state when you start. Where we have checked a local requirement against official sources, it is added to your completeness list with a link to the source.
Can I edit the draft?
Yes. Every finding, rating and sentence is editable before you sign. Your own entries always win over anything drafted from your notes.
What do I get at the end?
A signed, locked PDF for your client and an editable Word file, both with your company details. Signed reports keep a fingerprint so later changes are visible.