Project: Riverside Commons Building B 412 Mill Street GC: Hartwell Builders Date: 10/08/2026, 7:15am Inspected by: Marco Diaz, site superintendent (competent person) ...
We sorted 25 items into 11 sections and flagged 1 to fix first.
- Fix firstFall protection and openings
3rd floor east slab edge: guardrail missing a 12 ft section, framers working nearby.
- Fix soonScaffolds and aerial lifts
Scaffold north elevation: tag not signed today, one plank missing at top lift.
- Fix soonLadders
Stepladder with cracked side rail in the plumbing gang box, tagged Do Not Use
Still to add
- RecommendedNotes for site access, housekeeping and storage
- RecommendedNotes for corrective actions
Filled in for you
14 days free, nothing to pay today. After your first report, your name, license and company details fill in by themselves. Or preview your own notes first, no sign-up.
What goes in it
Every site safety inspection report from ReportDraft follows the same professional structure, so clients and reviewers find things where they expect them.
- Site access, housekeeping and storageDebris, scrap lumber with nails and combustible scrap cleared from work areas and stairs, Access routes, walkways and stairways clear and safe, Site perimeter, fencing, gates and warning signs, Materials stacked stable and kept back from edges and openings, Protruding rebar capped or guarded against impalement
- Fall protection and openingsOpen sides and edges protected by guardrails, nets or fall arrest, Floor holes, openings and skylights covered or guarded and marked, Harnesses, lanyards and anchors inspected before use and worn where needed, Roof work: guardrails, warning lines, nets or fall arrest in use
- Scaffolds and aerial liftsScaffolds inspected by a competent person before the shift (tag or record), Scaffold fully planked, with guardrails, base plates or mudsills, ties and safe access, Aerial and scissor lifts: pre-use check, gates closed, operators tied off in boom lifts
- LaddersLadders free of damage; defective ladders tagged Do Not Use and removed, Ladders set up correctly: extended above the landing or secured, on firm footing
- Excavations and trenchesExcavations inspected daily by a competent person, and after rain, Cave-in protection (sloping, shoring or a trench box) in place where needed, Spoils and equipment kept back from the edge; a ladder or ramp close by to get out, Underground utilities located and marked before digging
- Electrical and temporary powerGround fault protection (GFCI) or an assured grounding program on temporary power, Cords and plugs undamaged, ground pins present, kept out of water and traffic, Panels covered and labeled; no exposed live parts, Overhead power lines identified and kept clear of equipment and ladders
- Cranes, heavy equipment and vehiclesCranes inspected each shift by a competent person; rigging and slings in good condition, Swing radius barricaded; backup alarms working or a spotter used, Equipment run only by trained, authorized operators; seat belts used
- Tools and machine guardsGuards on saws and grinders in place and working, Damaged or noncompliant tools tagged out or removed, Powder-actuated tools and nail guns used by trained workers
- Fire prevention and hazardous materialsFire extinguishers on site, charged and within reach, Fuel, propane and flammables stored and labeled safely, Hot work: area cleared of combustibles, extinguisher and fire watch where needed, Chemical containers labeled; safety data sheets available; dust controlled when cutting
- Personal protective equipmentHard hats worn where there is a risk of falling or flying objects, Eye and face protection worn for cutting, grinding, nailing and chemicals, High-visibility vests, hearing protection, gloves and footwear suited to the work
- First aid, emergency and site facilitiesFirst aid kit stocked and a trained first aider on site when no clinic is close by, Emergency numbers, site address and plan posted; everyone knows the muster point, Toilets, drinking water and hand washing available
- Corrective actionsHazard and location, Corrective action, Responsible, Due, Status
- Items from earlier inspectionsItems from earlier inspections or reports, and whether each has been fixed.
How it works
1. Add your notes. Type or paste what you saw. Rate items with one tap if you like.
2. Get a draft. Findings, recommendations and a summary are written for you, in your report's structure.
3. Check, sign, send. A completeness list shows anything missing. Sign to lock the PDF and download Word too.
Why it pays for itself
What United States federal rules require
- The employer's accident prevention programs provide for frequent and regular inspections of the job site, materials and equipment, made by competent persons the employer designates29 CFR 1926.20 (b) (1), (2) · OSHA: 1926.20 General safety and health provisions
- A competent person is someone capable of identifying existing and predictable hazards in the surroundings or working conditions, with authorization to take prompt corrective measures to eliminate them29 CFR 1926.32 (f)
- Machinery, tools, material or equipment that does not comply with OSHA's construction rules may not be used: it is identified as unsafe by tagging, its controls are locked so it cannot run, or it is physically removed; only employees qualified by training or experience operate equipment and machinery29 CFR 1926.20 (b) (3), (4)
- Scaffolds and scaffold components are inspected for visible defects by a competent person before each work shift and after any occurrence that could affect a scaffold's structural integrity29 CFR 1926.451 (f) (3)
- A competent person inspects excavations, the adjacent areas and protective systems daily, before work starts and as needed through the shift, and again after every rainstorm or other hazard-increasing occurrence, when employee exposure can reasonably be anticipated; where there is evidence of a possible cave-in, a failing protective system, a hazardous atmosphere or another hazardous condition, exposed employees are removed until it is made safe29 CFR 1926.651 (k) (1), (2)
- Each employee in an excavation is protected from cave-ins by an adequate protective system, unless the excavation is entirely in stable rock, or is less than 5 feet deep and a competent person's examination of the ground shows no indication of a potential cave-in29 CFR 1926.652 (a) (1)
- Before an excavation is opened, the estimated location of underground utilities is determined; trenches 4 feet deep or more have a stairway, ladder, ramp or other safe way out within 25 feet of lateral travel; excavated material and equipment are kept at least 2 feet from the edge or held back by retaining devices29 CFR 1926.651 (b) (1) · 29 CFR 1926.651 (c) (2) · 29 CFR 1926.651 (j) (2)
- Each employee on a walking or working surface with an unprotected side or edge 6 feet or more above a lower level is protected by a guardrail system, safety net system or personal fall arrest system; holes, including skylights, more than 6 feet above a lower level are protected by fall arrest, covers or guardrails, and all holes are covered against tripping or stepping through29 CFR 1926.501 (b) (1), (4)
- Personal fall arrest systems are inspected before each use for wear, damage and other deterioration, and defective components are removed from service29 CFR 1926.502 (d) (21)
- Portable ladders used to reach an upper landing extend at least 3 feet above it, or are secured at the top with a grab rail; ladders are inspected by a competent person for visible defects periodically and after any occurrence that could affect safe use; portable ladders with structural defects are marked or tagged "Do Not Use" and withdrawn from service until repaired29 CFR 1926.1053 (b) (1), (15), (16)
- Employees on construction sites are protected by ground fault circuit interrupters or an assured equipment grounding conductor program; all 120-volt, single-phase, 15- and 20-ampere receptacles that are not part of the building's permanent wiring and are in use by employees have approved GFCIs (small insulated generators of 5 kW or less excepted)29 CFR 1926.404 (b) (1) (i), (ii)
- A competent person begins a visual inspection of a crane or derrick before each shift it will be used, completed before or during that shift; when a deficiency is found, the competent person decides at once whether it is a safety hazard, and if it is, the equipment is taken out of service until corrected29 CFR 1926.1412 (d) (1), (2)
- A fire extinguisher rated at least 2A is provided for each 3,000 square feet of protected building area, with no more than 100 feet of travel to the nearest one29 CFR 1926.150 (c) (1) (i)
- All protruding reinforcing steel onto and into which employees could fall is guarded to eliminate the hazard of impalement29 CFR 1926.701 (b)
- Form and scrap lumber with protruding nails and all other debris are kept cleared from work areas, passageways and stairs; combustible scrap is removed at regular intervals; covered containers are provided for oily, flammable or hazardous waste29 CFR 1926.25
- Employees working where there is a possible danger of head injury from impact, falling or flying objects, or electrical shock and burns are protected by protective helmets29 CFR 1926.100 (a)
- Provision is made before the project starts for prompt medical attention in case of serious injury; where no clinic, hospital or physician is reasonably accessible, a person with a valid first aid certificate is available at the worksite; first aid supplies are easily accessible29 CFR 1926.50 (b), (c), (d) (1)
- The employer instructs each employee in recognizing and avoiding unsafe conditions and in the regulations that apply to their work environment29 CFR 1926.21 (b) (2)
- States with OSHA-approved State Plans develop and enforce their own standards, which must be at least as effective as the federal ones on the same issues29 CFR 1902.1 (b)
On United States construction sites, OSHA's construction standards (29 CFR part 1926) require frequent and regular site inspections by a competent person, plus specific checks of scaffolds, trenches, ladders and cranes. Here is what each rule says, with a link to the official text.
Who inspects, and how often
The employer's safety program must include frequent and regular inspections of the job site, materials and equipment by competent persons the employer designates. A competent person can spot existing and predictable hazards and has the authority to fix them promptly. Equipment, tools or material that do not comply are tagged as unsafe, locked out or removed, and only workers qualified by training or experience run machinery.
Some checks have fixed timing. Scaffolds are inspected before each work shift and after anything that could affect them. Excavations are inspected daily before work starts, during the shift as needed and after every rainstorm. Cranes get a visual inspection by a competent person each shift they are used, and a deficiency that is a safety hazard takes the crane out of service until it is fixed.
Falls, ladders and trenches
Edges 6 feet or more above a lower level need guardrails, safety nets or personal fall arrest, and holes need covers or guardrails. Harnesses and lanyards are inspected before each use. Portable ladders extend 3 feet above the landing or are secured, and a ladder with a structural defect is tagged Do Not Use and taken out of service.
Workers in an excavation need cave-in protection unless it is entirely in stable rock, or under 5 feet deep with a competent person seeing no sign of a cave-in. Utilities are located before digging, trenches 4 feet or deeper have a ladder, ramp or stairway within 25 feet, and spoil piles stay at least 2 feet back from the edge.
Power, fire, housekeeping and first aid
Temporary power needs ground fault circuit interrupters on 120-volt, 15- and 20-amp receptacles, or an assured equipment grounding program. A 2A fire extinguisher is provided for every 3,000 square feet, within 100 feet of travel. Scrap lumber with nails and other debris is kept out of work areas, passageways and stairs, protruding rebar is guarded so no one can be impaled, and hard hats are worn wherever something could fall or fly.
Before work begins, the employer plans for prompt medical care. Where no clinic or hospital is reasonably close, a certified first aider is on site, and first aid supplies are easy to reach. Every worker is taught to recognize and avoid the unsafe conditions of their work.
State Plan states
Some states run their own OSHA-approved State Plans with construction rules that must be at least as effective as the federal ones and can be stricter, so check your state's program as well.
Common mistakes
- Walking the site once a week and treating it as the scaffold and trench inspections, which have their own timing.
- Writing "guardrail missing" without the floor, edge and who was exposed.
- Leaving a damaged ladder or tool in the gang box instead of tagging it out.
- Not re-inspecting a trench after overnight rain before anyone goes in.
- Listing hazards with no one named to fix them and no date.
Sources
- 29 CFR 1926.20 (b) (1), (2), checked October 12, 2026
- OSHA: 1926.20 General safety and health provisions, checked October 12, 2026
- 29 CFR 1926.32 (f), checked October 12, 2026
- 29 CFR 1926.20 (b) (3), (4), checked October 12, 2026
- 29 CFR 1926.451 (f) (3), checked October 12, 2026
- 29 CFR 1926.651 (k) (1), (2), checked October 12, 2026
- 29 CFR 1926.652 (a) (1), checked October 12, 2026
- 29 CFR 1926.651 (b) (1), checked October 12, 2026
- 29 CFR 1926.651 (c) (2), checked October 12, 2026
- 29 CFR 1926.651 (j) (2), checked October 12, 2026
- 29 CFR 1926.501 (b) (1), (4), checked October 12, 2026
- 29 CFR 1926.502 (d) (21), checked October 12, 2026
- 29 CFR 1926.1053 (b) (1), (15), (16), checked October 12, 2026
- 29 CFR 1926.404 (b) (1) (i), (ii), checked October 12, 2026
- 29 CFR 1926.1412 (d) (1), (2), checked October 12, 2026
- 29 CFR 1926.150 (c) (1) (i), checked October 12, 2026
- 29 CFR 1926.701 (b), checked October 12, 2026
- 29 CFR 1926.25, checked October 12, 2026
- 29 CFR 1926.100 (a), checked October 12, 2026
- 29 CFR 1926.50 (b), (c), (d) (1), checked October 12, 2026
- 29 CFR 1926.21 (b) (2), checked October 12, 2026
- 29 CFR 1902.1 (b), checked October 12, 2026
Last reviewed October 12, 2026. Next review due January 12, 2027. This page explains published rules to help you write your report. It is not legal advice; the official text linked above governs. State rules can add to these.
Site safety inspection report rules by state
The key rule in each state, linked to the official text. Each guide lists every rule with its sources, and each template is set up for that state. Last reviewed October 12, 2026.
| State | Key rule | Official source |
|---|---|---|
| CaliforniaTemplate | Keep this inspection record for at least one year | Cal. Code Regs., tit. 8, s. 3203 (b) (1) and exception |
| OregonTemplate | A safety meeting this month and before each job longer than a week, recorded and kept 3 years | OAR 437-001-0765 (10) to (14), Table 3 |
| WashingtonTemplate | A weekly walk-around by management and an employee-elected representative, documented and kept until the job ends | WAC 296-155-110 (9) |
Template preview
Questions
What goes in a site safety inspection report?
A walk-through record of a construction site: fall protection, scaffolds, ladders, trenches, power, equipment, fire and PPE, every hazard with how serious it is, who fixes it and by when, and what happened to items from the last inspection. ReportDraft lays it out in 13 sections: site access, housekeeping and storage, fall protection and openings, scaffolds and aerial lifts, ladders, excavations and trenches, electrical and temporary power, cranes, heavy equipment and vehicles, tools and machine guards, fire prevention and hazardous materials, personal protective equipment, first aid, emergency and site facilities, corrective actions, items from earlier inspections.
Do my state's rules change the report?
Pick your state when you start. Where we have checked a local requirement against official sources, it is added to your completeness list with a link to the source.
Can I edit the draft?
Yes. Every finding, rating and sentence is editable before you sign. Your own entries always win over anything drafted from your notes.
What do I get at the end?
A signed, locked PDF for your client and an editable Word file, both with your company details. Signed reports keep a fingerprint so later changes are visible.
Which plan covers it?
ReportDraft Construction covers a site safety inspection report along with daily construction reports, swppp inspections, incident reports. Site Safety Inspections is also sold on its own.
How often does OSHA require construction site inspections?
OSHA requires frequent and regular inspections of the job site, materials and equipment by a competent person. Scaffolds are inspected before each shift, excavations daily and after rain, and cranes each shift they are used.
Who is a competent person under OSHA's construction rules?
Someone who can identify existing and predictable hazards on the site and has the authority to take prompt corrective measures to eliminate them.
At what height is fall protection required in construction?
At 6 feet or more above a lower level, through guardrails, safety nets or personal fall arrest systems.
When does a trench need shoring or a trench box?
Workers in an excavation need cave-in protection unless it is entirely in stable rock, or less than 5 feet deep and a competent person finds no sign of a potential cave-in.